A survey was prepared for a large waterfront amphitheater to be used as a base map to design pedestrian access from parking fields and utility routing. Additionally, the survey was extended to a portion of the surrounding Jamaica Bay to facilitate the design of sea walls to reduce the chances of flooding due to storm surge and sea level rise.