The Stonefield team developed a plan for A. Duie Pyle for a new distribution facility in the Bronx. Since the site is located within the floodplain, the design required raising the site 5-6 FT in order to meet State requirements. Other design challenges included designing a new bulkhead wall along the east river and optimizing the layout to maximize the building area, while ensuring adequate truck circulation. Construction was completed last year and the site is currently operational.
