Bayonne Fluitec

June 20 2015
Topics:   Site-Civil
Bayonne Fluitec

Always dynamic and true to Bayonne, Alessi brings Fluitec to a building that has been vacant since the time the Brass Foundry operation shut down along Fifth Street in Bayonne.  The site is well-served by the NJ Transit Light Rail and Route 440 making it an ideal location for Fluitec’s urban employee base.  The location will consolidate Fluitec’s NJ operation into one, integrated office and fabrication facility.  Peer out the front windows and you’ll see the amazing effort being put into the new Bayonne Bridge.  Beautiful concrete resurfacing work has been completed to bring the site up to a new standard and renovations are set to begin in Spring/Summer 2015.